Permanent waterproofing solution
Hellmann Calipar Healthcare Logistics:
Rectified the damaged metal roof area with MATRIX permanent waterproofing solution and also resolved the overheating issue caused due to damaged metal roof. Counteracted the development of heat island effect by installing Matrix Cool Exterior coating along the wall area that brought immediate tangible results.
Location: Dubai
Building Type: Warehouse
Area protected: 13,580 m²
matrix bldg projects
Hellmann Calipar Healthcare Logistics:
Rectified the damaged metal roof area with MATRIX permanent waterproofing solution and also resolved the overheating issue caused due to damaged metal roof. Counteracted the development of heat island effect by installing Matrix Cool Exterior coating along the wall area that brought immediate tangible results.
Location: Dubai
Building Type: Warehouse
Area protected: 13,580 m²